Aqua~Flo Pond Construction Day

Excavated hole showing stepped ledges
Excavated hole showing stepped ledges
Laying out the under layment
Laying out the under layment
Dave Duensing from PSA has eveyone's attention
Dave Duensing from PSA has eveyone's attention
The Puri Falss set in place
The Puri Falss set in place
Pro 900 Skimmer with bottom drain attached
Pro 900 Skimmer with bottom drain attached
Bottom Drian pipe going through liner
Bottom Drian pipe going through liner
It is getting there
It is getting there
Mike Daley & Randy Haney discussing the Pro 700 Skimmer
Mike Daley & Randy Haney discussing the Pro 700 Skimmer
Eileen supervising the job
Eileen supervising the job
Construction of the waterfalls
Construction of the waterfalls
Pro 700 Skimmer all set up
Pro 700 Skimmer all set up
Skimmer in action
Skimmer in action
Water starting to flow- top view
Water starting to flow- top view
View of pond
View of pond
The skimmer did its job
The skimmer did its job
Waterfall in action
Waterfall in action
An overview of the pond
An overview of the pond
Teaching the puppy to swim
Teaching the puppy to swim
Landscaped pond
Landscaped pond
Pond with night lighting #1
Pond with night lighting #1
Pond with night lighting #2
Pond with night lighting #2